top of page
9. Stuffing into container.jpg
1. DG Container Opened for Ventilation

1. DG Container Opened for Ventilation

2

2. Inspection of Consignment prior to any further handling

3

3. Gas Free Testing prior to Start Work to ensure Staff and Surveyor Safety

4. Men in Full Chemical PPE.

4. Men in Full Chemical PPE.

5. Identification of Leaking Drum

5. Identification of Leaking Drum

6. Gradual and Cautios Unstuffing

6. Gradual and Cautios Unstuffing

7

7. Neutralizing of Contaminated Floorboard

8

8. Preperation for transfer of DG contents into new drum

9. Stuffing into container

9. Stuffing into container

10

10. End of Operations with Bulk Head placed along door section

REWORKING DANGEROUS GOODS

bottom of page